JIAHUA

Three geophysical exploration projects in Junggar Basin all have a first-grade and second-grade product rate of over 97%

      The rate of first and second grade products is more than 97%

      Three 3D seismic exploration and acquisition projects in the northwest margin of Junggar Basin, Xinjiang, were accepted by Xinjiang Oilfield Company on May 12. Three geophysical exploration projects undertaken by the Northern Xinjiang Management Department of Oriental Geophysical Exploration Company have completed 162 3D seismic lines, and 51,704 production records have been obtained, with the first-grade and second-grade product rates above 97%.

      During the construction period, the workers overcame the construction difficulties caused by the blizzard and cold weather rarely seen in Xinjiang in 50 years, as well as the complex surface conditions such as the interweaving of agriculture, forest, rivers and marshes in the work area. Through strict management and scientific organization, the high quality, efficient and safe production was realized. The first-grade and second-grade product rate of the three projects was above 97%. In particular, the "3D Seismical Exploration and Collection Project in Hongqoba Area, Northwest Margine of Junggar Basin" undertaken by Team 2125, the first-grade and second-grade product rate was as high as 99.99%. The completion of these three projects has laid a foundation for solving the problem of crude oil production decline year by year in the northwestern margin of Junggar Basin


下一条:Prospects of China's Petroleum and Petrochemical Equipment Manufacturing Industry during the 12th Five-Year Plan Period

上一条:Iran plans to hold international tenders for eight new oil and gas exploration blocks

返回列表